Teeside EfW

An EfW facility with three co-located plants providing 5 process lines overall (lines 1 and 2, line 3 - often known as Suez Tees Valley - and lines 4 and 5 often known as The North East Energy Recovery Centre or NEERC).

The combined permitted capacity is around 642,000 tonnes per year, and is operated by Suez. Delivery of waste is by rail and road and the facility processes primarily residual Household Waste and Commercial Waste.

Image

Site Details

No data available at present.

Plant Description

The lines are all based on conventional combustion technology and considered an ERF based on multiple R1 status/classifications.

The original plant and first two lines were built by Babcock & Wilcox Volund.

The third line built by AE&E Inova AG which is now Hitachi Zosen Inova AG (part of the Hitachi Zosen Corporation)[2] as a turnkey project processing 19 tonnes/hour and generating 26 MWe from a conventional combustion technology, a Hitachi Zosen Inova Grate R-100060 air cooled grate based on a CV of between 7.6 and 12.5MJ/kg and is called Cleveland in the company literature[3].

Lines 4 and 5 were of similar capacity and specification for each line as per the third line installed (i.e. 26 MWe per line or 52 MWe in total) processing 256,000 tonnes per annum on the basis of the same CV and at a capital cost of GBP £150m and is called Cleveland 4+5 in the company literature.

History

The facilities were built at Teeside (often also known as Billingham and/or Haverton Hill) in 3 phases. Lines 1, 2 were opened in May 1998 as a collaboration between Suez and Stockton, Middlesbrough, and Redcar & Cleveland with a capacity of around 250,000 tonnes per annum.

Line 3 was built and opened in May 2009 (operational 2008) as an extension to the first two lines, and as part of a PPP with Northumberland signed in 2006 for 28 years with a capacity of 136,000 tonnes per annum.

Lines 4 and 5 link to a PFI serving the South Tyne & Wear Partnership in a separate building with a capacity of 256,000 tonnes per annum, giving a total capacity for the site of 642,000 tonnes per annum.

A further plant secured planning in 2014 on the same site in Haverton Hill, with capacity for an additional 200,000 tonnes per year but is not presently under construction[1]. This site and the planned site are discrete from the operational plant at Wilton operated by Suez.